GHG CleanProjects Registry: Project Listing
There are 86 projects with
serialized VERRs
listed in the GHG CleanProjects™ Registry. A legend with the numbering system index is at the bottom of this page.
- [This sort option will list the projects based on the vintage or year that you choose for the serialized verified emission reductions or removals (VERRs).]
| Listed Projects: | Project Dates: | Total Serialized Verified Emission Reductions/Removals (VERRs) | Estimated potential lifetime emission reductions-removals | |||||
| project identifier: | 9337-2554 | Start: | 2004-01-01 | 24,203 t CO2 e | 24,205 t CO2 e | |||
| title: | Aéroport de Montréal's Energy Efficiency Measures for GHG Emission Reductions Project | End: | 2009-12-31 | |||||
| type: | Energy Efficiency | |||||||
| project identifier: | 3064-5172 | Start: | 2002-01-01 | 113,584 t CO2 e | 110,000 t CO2 e | |||
| title: | Aggregation of Carbon Credits from No-Till and Reduced Till Agricultural Practice (Pool 2) | End: | 2007-12-31 | |||||
| type: | No-till agriculture, Reduced-till agriculture | |||||||
| project identifier: | 6369-3653 | Start: | 2002-01-01 | 76,878 t CO2 e | 2,000,000 t CO2 e | |||
| title: | Aggregation of Carbon Credits from No-till or Reduced Till Agricultural Practice | End: | 2015-12-31 | |||||
| type: | Reduced-till agriculture, No-till agriculture | |||||||
| project identifier: | 7342-8764 | Start: | 2009-01-12 | 15,549 t CO2 e | 160,000 t CO2 e | |||
| title: | AltaGas Bantry Acid Gas Injection Project | End: | 2016-12-31 | |||||
| type: | Acid Gas Injection | |||||||
| project identifier: | 8626-2593 | Start: | 2007-01-01 | 2,209 t CO2 e | 22,000 t CO2 e | |||
| title: | AltaGas Princess Acid Gas Injection Project | End: | 2008-02-13 | |||||
| type: | Acid Gas Injection | |||||||
| project identifier: | 9524-8578 | Start: | 2002-01-01 | 26,000 t CO2 e | 725,394 t CO2 e | |||
| title: | Avoidance of methane production from decay of biomass through composting | End: | 2010-12-31 | |||||
| type: | Methane Venting Reduction | |||||||
| project identifier: | 9251-0905 | Start: | 1999-01-01 | 33,712 t CO2 e | 397,652 t CO2 e | |||
| title: | Belize and Nicaragua Logs Recovery Project | End: | 2010-12-31 | |||||
| type: | Reduced deforestation | |||||||
| project identifier: | 5708-6545 | Start: | 2007-01-01 | 17,170 t CO2 e | 121,600 t CO2 e | |||
| title: | Blue Ridge Lumber THF Biomass Burner Project | End: | 2015-01-01 | |||||
| type: | Biomass Energy | |||||||
| project identifier: | 4952-8046 | Start: | 2009-05-01 | 4,220 t CO2 e | 104,800 t CO2 e | |||
| title: | Brokenlande Biogas Project | End: | 2029-05-01 | |||||
| type: | Methane Venting Reduction | |||||||
| project identifier: | 2629-5810 | Start: | 2002-01-01 | 106,120 t CO2 e | 106,120 t CO2 e | |||
| title: | Carbon Credit Solutions Inc. Tillage Project #4 | End: | 2009-12-31 | |||||
| type: | No-till agriculture, Reduced-till agriculture | |||||||
| project identifier: | 3293-0821 | Start: | 2002-01-01 | 63,008 t CO2 e | 2,000,000 t CO2 e | |||
| title: | Carbon Reduction Offset Project | End: | 2009-12-31 | |||||
| type: | No-till agriculture | |||||||
| project identifier: | 8750-4168 | Start: | 2002-01-01 | 833 t CO2 e | 73,056 t CO2 e | |||
| title: | Carbon Reduction Offset Project - Series 2 | End: | 2008-12-31 | |||||
| type: | No-till agriculture | |||||||
| project identifier: | 5876-5670 | Start: | 2002-01-01 | 15,293 t CO2 e | 185,954 t CO2 e | |||
| title: | Carbon Reduction Offset Project - Series 4 | End: | 2008-12-31 | |||||
| type: | No-till agriculture | |||||||
| project identifier: | 6100-7651 | Start: | 2004-01-01 | 195,722 t CO2 e | 640,000 t CO2 e | |||
| title: | Cargill High River Methane Capture Project | End: | 2011-12-31 | |||||
| type: | Anaerobic Wastewater Treatment | |||||||
| project identifier: | 0766-3464 | Start: | 2007-05-01 | 94,463 t CO2 e | 480,000 t CO2 e | |||
| title: | Chin Chute Wind Power Project | End: | 2015-05-31 | |||||
| type: | Wind Energy | |||||||
| project identifier: | 1717-3741 | Start: | 2005-08-21 | 394,130 t CO2 e | 1,200,000 t CO2 e | |||
| title: | Clover Bar Landfill Gas Generating Station | End: | 2013-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 4593-7854 | Start: | 2007-05-01 | 87,322 t CO2 e | 1,200,000 t CO2 e | |||
| title: | CO2 Capture from Prentiss1 for EOR | End: | 2014-12-31 | |||||
| type: | CO2 Injection | |||||||
| project identifier: | 3482-7976 | Start: | 2006-01-01 | 121,827 t CO2 e | 640,000 t CO2 e | |||
| title: | CO2 Capture from Prentiss2 for EOR | End: | 2013-12-31 | |||||
| type: | CO2 Injection | |||||||
| project identifier: | 4765-7933 | Start: | 2003-01-01 | 12,274 t CO2 e | 12,273 t CO2 e | |||
| title: | Commission Scolaire Marguerite-Bourgeoys' (CSMB) energy efficiency measures for GHG Emission Reductions Project | End: | 2008-12-31 | |||||
| type: | Energy Efficiency | |||||||
| project identifier: | 8047-8047 | Start: | 2002-01-01 | 47,736 t CO2 e | 4,200,000 t CO2 e | |||
| title: | East Landfill - Landfill Gas Recovery and Utilization Project | End: | 2016-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 8444-7468 | Start: | 2002-01-01 | 12,622 t CO2 e | 65,548 t CO2 e | |||
| title: | ECC Tillage Management Project #5 | End: | 2008-12-31 | |||||
| type: | No-till agriculture, Reduced-till agriculture | |||||||
| project identifier: | 8702-6958 | Start: | 2002-01-01 | 74,485 t CO2 e | 75,000 t CO2 e | |||
| title: | ECC Tillage Management Project #6 | End: | 2009-12-31 | |||||
| type: | No-till agriculture, Reduced-till agriculture | |||||||
| project identifier: | 8047-4011 | Start: | 2007-01-01 | 260,061 t CO2 e | 223,604 t CO2 e | |||
| title: | Edmonton Composting Facility | End: | 2008-12-31 | |||||
| type: | Aerobic Composting | |||||||
| project identifier: | 8828-9938 | Start: | 2002-01-01 | 417,606 t CO2 e | 417,618 t CO2 e | |||
| title: | Emission Credits Corporation Tillage Program | End: | 2006-12-31 | |||||
| type: | No-till agriculture, Reduced-till agriculture | |||||||
| project identifier: | 2474-6209 | Start: | 2009-01-01 | 47,264 t CO2 e | 600,000 t CO2 e | |||
| title: | Essex-Windsor Regional Landfill Gas Capture and Destruction Project | End: | 2019-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 8180-7777 | Start: | 2009-05-14 | 13,873 t CO2 e | 169,646 t CO2 e | |||
| title: | Extraction et combustion des biogaz - CESA | End: | 2013-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 9370-7483 | Start: | 2009-05-27 | 9,846 t CO2 e | 185,969 t CO2 e | |||
| title: | Extraction et combustion des biogaz - RDL | End: | 2013-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 0883-0920 | Start: | 2009-06-08 | 9,154 t CO2 e | 158,256 t CO2 e | |||
| title: | Extraction et combustion des biogaz - RIRT | End: | 2013-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 7910-0498 | Start: | 2002-01-01 | 32,438 t CO2 e | 119,478 t CO2 e | |||
| title: | Ferti-Val and Agrior Greenhouse Gas Emission Reductions Composting Project | End: | 2007-03-31 | |||||
| type: | Waste Diversion | |||||||
| project identifier: | 3048-9943 | Start: | 2006-06-01 | 37,147 t CO2 e | 150,000 t CO2 e | |||
| title: | Heffley Creek Biomass Gasification Project | End: | 2026-06-01 | |||||
| type: | Biomass Energy | |||||||
| project identifier: | 3574-1666 | Start: | 1999-01-01 | 2,000 t CO2 e | 138,682 t CO2 e | |||
| title: | IMAFLEX GHG emission reductions/Plastic Recycling Project | End: | 2006-12-31 | |||||
| type: | Plastic Recycling | |||||||
| project identifier: | 3168-5278 | Start: | 2009-08-19 | 3,546 t CO2 e | 40,329 t CO2 e | |||
| title: | Implantation d'un réseau de captage et de destruction du biogaz au lieu d'enfouissement sanitaire de La Lièvre | End: | 2013-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 9851-6244 | Start: | 2009-08-12 | 3,514 t CO2 e | 37,656 t CO2 e | |||
| title: | Implantation d'un réseau de captage et de destruction du biogaz au lieu d'enfouissement sanitaire de Saint-Raymond | End: | 2013-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 7393-3044 | Start: | 2009-08-27 | 4,517 t CO2 e | 48,975 t CO2 e | |||
| title: | Implantation d'un réseau de captage et de destruction du biogaz au lieu d'enfouissement sanitaire de Ville de Rivière Rouge | End: | 2013-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 7514-3762 | Start: | 2009-07-15 | 8,199 t CO2 e | 73,556 t CO2 e | |||
| title: | Implantation d'un réseau de captage et de destruction du biogaz au lieu d'enfouissement sanitaire Saint-Lambert-de-Lauzon | End: | 2013-12-31 | |||||
| type: | Landfill Gas Capture | |||||||
| project identifier: | 1840-6051 | Start: | 2006-10-01 | 5,915 t CO2 e | 15,949,205 t CO2 e | |||
| title: | Intermodal Transportation Project | End: | 2016-09-30 | |||||
| type: | Intermodal transportation | |||||||
| project identifier: | 6821-1178 | Start: | 2007-01-01 | 195,069 t CO2 e | 601,803 t CO2 e | |||
| title: | Kettles Hill Offset Project | End: | 2014-12-31 | |||||
| type: | Wind Energy | |||||||
| project identifier: | 0043-9907 | Start: | 2004-10-01 | 177,339 t CO2 e | 1,800,000 t CO2 e | |||
| title: | Magrath Wind Power Project | End: | 2034-10-01 | |||||
| type: | Wind Energy | |||||||
| project identifier: | 6703-4605 | Start: | 2003-02-09 | 248,612 t CO2 e | 219,702 t CO2 e | |||
| title: | McBride Lake Offset Project Phase 1 | End: | 2007-12-31 | |||||
| type: | Wind Energy | |||||||
| project identifier: | 2690-5813 | Start: | 2003-01-01 | 62,651 t CO2 e | 103,320 t CO2 e | |||
| title: | Minas Basin GHG emission reductions | End: | 2010-12-31 | |||||
| type: | Energy Efficiency | |||||||
| project identifier: | 3547-4902 | Start: | 2004-08-01 | 73,881 t CO2 e | 1,206,271 t CO2 e | |||
| title: | Nakkawita, Pantak, and Gurulawana Small Scale Hydropower Projects | End: | 2054-07-31 | |||||
| type: | Hydro Energy | |||||||
| project identifier: | 7732-0939 | Start: | 2005-01-07 | 112,897 t CO2 e | 5,500,000 t CO2 e | |||
| title: | Natural Gas Combined Cycled Power Generation Plant | End: | 2030-12-31 | |||||
| type: | Electricity Generation | |||||||
| project identifier: | 2101-0072 | Start: | 2002-01-01 | 21,968 t CO2 e | 175,744 t CO2 e | |||
| title: | Natural Gas Reduction Project | End: | 2007-10-01 | |||||
| type: | Electricity Generation, Energy Efficiency | |||||||
| project identifier: | 5938-7350 | Start: | 2003-06-01 | 428,082 t CO2 e | 640,000 t CO2 e | |||
| title: | Oldman River Hydroelectric Power Plant | End: | 2011-05-31 | |||||
| type: | Electricity Generation | |||||||
| project identifier: | 9238-1983 | Start: | 2008-05-15 | 30,684 t CO2 e | 3,200,000 t CO2 e | |||
| title: | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | End: | 2014-12-31 | |||||
| type: | Nitrous Oxide Abatement from Nitric Acid Production | |||||||
| project identifier: | 5859-2714 | Start: | 2001-01-01 | 69,420 t CO2 e | 429,848 t CO2 e | |||
| title: | PerfectPleat Extended Surface Pleated Filter Project | End: | 2039-05-30 | |||||
| type: | Energy Conservation | |||||||
| project identifier: | 6717-8308 | Start: | 2003-01-01 | 12,695 t CO2 e | 522,442 t CO2 e | |||
| title: | Post-Industrial Plastic Recycling | End: | 2015-12-31 | |||||
| type: | Waste Diversion | |||||||
| project identifier: | 6375-2711 | Start: | 2002-01-01 | 49,042 t CO2 e | 49,042 t CO2 e | |||
| title: | Preferred Carbon Land Management Solutions Pilot Tillage Project | End: | 2009-12-31 | |||||
| type: | No-till agriculture, Reduced-till agriculture | |||||||
| project identifier: | 9091-1884 | Start: | 2006-04-01 | 10,867 t CO2 e | 20,307 t CO2 e | |||
| title: | Projet d'implantation de mesures d'efficacité énergétique pour la réduction des gaz à effet de serre (GES) de l'Office municipal d'habitation de Montréal (OMHM) | End: | 2010-12-31 | |||||
| type: | Energy Efficiency | |||||||
| project identifier: | 3876-3354 | Start: | 2003-10-23 | 6,000 t CO2 e | 678,605 t CO2 e | |||
| title: | Quantification of CO2 eq emission reductions from slag-based recycling operations by Matériaux Excell | End: | 2007-12-31 | |||||
| type: | Waste Diversion | |||||||
| project identifier: | 8316-1152 | Start: | 2002-11-01 | 22,614 t CO2 e | 22,614 t CO2 e | |||
| title: | Quantification of net CO2e emission reductions for the manufacturing of pallets made from 100% recycled plastic by Solplast Inc. (2002-2006) | End: | 2006-12-31 | |||||
| type: | Waste Diversion | |||||||
| project identifier: | 9181-5474 | Start: | 2002-11-01 | 54,294 t CO2 e | 54,294 t CO2 e | |||
| title: | Quantification of net CO2e emission reductions from plastic and rubber recycling operations by Solplast Inc. | End: | 2008-12-31 | |||||
| type: | Waste Diversion | |||||||
| project identifier: | 6060-2548 | Start: | 2002-01-01 | 214,296 t CO2 e | 474,296 t CO2 e | |||
| title: | Quantification of net CO2e emission reductions from polyethylene terephtalate and polypropylene recycling operations by Plastrec Inc. (2002-2006) | End: | 2011-12-31 | |||||
| type: | Waste Diversion | |||||||
| project identifier: | 4491-4407 | Start: | 2001-01-01 | 2,800 t CO2 e | 41,592 t CO2 e | |||
| title: | Recovery of Manure/Recovered manure for cow bedding and fertilizer | End: | 2006-12-31 | |||||
| type: | Methane Venting Reduction | |||||||
| project identifier: | 9818-8372 | Start: | 2003-01-01 | 6,521 t CO2 e | 70,646 t CO2 e | |||
| title: | Recyc RPM GHG Emission Reductions Recycling Project | End: | 2006-12-31 | |||||
| type: | Recycling | |||||||
| project identifier: | 1577-8473 | Start: | 2002-01-01 | 133,196 t CO2 e | 2,000,000 t CO2 e | |||
| title: | Reduced and Zero Tillage Management | End: | 2015-12-31 | |||||
| type: | Reduced-till agriculture, No-till agriculture | |||||||
| project identifier: | 7850-9764 | Start: | 2002-01-01 | 66,300 t CO2 e | 2,000,000 t CO2 e | |||
| title: | Reduced and Zero Tillage Management - Pool 3 | End: | 2015-12-31 | |||||
| type: | No-till agriculture, Reduced-till agriculture | |||||||
| project identifier: | 6796-8882 | Start: | 2005-09-01 | 6,575 t CO2 e | 56,000 t CO2 e | |||
| title: | Refiner Plate Energy Savings Project | End: | 2009-12-31 | |||||
| type: | Energy Conservation | |||||||
| project identifier: | 4825-6129 | Start: | 2000-01-01 | 17,500 t CO2 e | 162,500 t CO2 e | |||
| title: | Royal Mat Inc. - Recycling of tires/Manufacturing of mats with recycled tires | End: | 2010-12-31 | |||||
| type: | Waste Diversion | |||||||
| project identifier: | 8524-7427 | Start: | 2005-01-01 | 128,979 t CO2 e | 360,000 t CO2 e | |||
| title: | Slave Lake Pulp Energy Efficiency Project | End: | 2013-12-31 | |||||
| type: | Energy Efficiency | |||||||
| project identifier: | 7635-3949 | Start: | 2006-09-01 | 258,498 t CO2 e | 3,200,000 t CO2 e | |||
| title: | Soderglen Windfarm Project | End: | 2026-01-28 | |||||
| type: | Wind Energy | |||||||
| project identifier: | 7758-5940 | Start: | 2002-01-01 | 224,000 t CO2 e | 2,320,000 t CO2 e | |||
| title: | Summerview and Waterton South Wind Farms Offset Project | End: | 2031-01-01 | |||||
| type: | Wind Energy | |||||||
| project identifier: | 2959-5549 | Start: | 2007-03-05 | 25,564 t CO2 e | 80,000 t CO2 e | |||
| title: | Suncor South Rosevear Acid Gas Injection Offset Project | End: | 2015-03-04 | |||||
| type: | Acid Gas Injection | |||||||
| project identifier: | 7048-9023 | Start: | 2005-10-01 | 48,525 t CO2 e | 20,000 t CO2 e | |||
| title: | Sundance Biomass Energy Generation Projects | End: | 2013-10-01 | |||||
| type: | Biomass Energy | |||||||
| project identifier: | 3157-5491 | Start: | 2008-01-01 | 13,771 t CO2 e | 117,600 t CO2 e | |||
| title: | Sundre Forest Product TFH Biomass Burner Project | End: | 2016-01-01 | |||||
| type: | Biomass Energy | |||||||
| project identifier: | 6878-6600 | Start: | 2004-11-30 | 384,324 t CO2 e | 800,000 t CO2 e | |||
| title: | Taylor Turin Acid Gas Injection Project | End: | 2012-11-30 | |||||
| type: | Acid Gas Injection | |||||||
| project identifier: | 4168-9826 | Start: | 2002-01-01 | 179,126 t CO2 e | 220,248 t CO2 e | |||
| title: | Terra Verde Aggregation Contract I and II | End: | 2008-10-02 | |||||
| type: | No-till agriculture | |||||||
| project identifier: | 3641-1106 | Start: | 2002-01-01 | 6,769 t CO2 e | 111,598 t CO2 e | |||
| title: | Terra Verde Aggregation Contract IV | End: | 2009-12-31 | |||||
| type: | No-till agriculture, Reduced-till agriculture | |||||||
| project identifier: | 9563-5577 | Start: | 2002-01-01 | 8,944 t CO2 e | 500,000 t CO2 e | |||
| title: | Tillage 09 #1 | End: | 2008-12-31 | |||||
| type: | Reduced-till agriculture, No-till agriculture | |||||||
| project identifier: | 8614-1303 | Start: | 2002-01-01 | 42,944 t CO2 e | 4,000,000 t CO2 e | |||
| title: | Tillage Management Offset Project | End: | 2015-01-01 | |||||
| type: | Sequestration | |||||||
| project identifier: | 3877-1697 | Start: | 2006-01-01 | 60,000 t CO2 e | 2,500,000 t CO2 e | |||
| title: | Verdant Energy Limited - Dapp Power Electric Generation Facility | End: | 2031-12-31 | |||||
| type: | Biomass Energy | |||||||
| project identifier: | 8209-2096 | Start: | 2002-01-01 | 205,310 t CO2 e | 205,310 t CO2 e | |||
| title: | Viterra's Tillage Management Offset Project - Series 6 | End: | 2009-12-31 | |||||
| type: | Reduced-till agriculture, No-till agriculture | |||||||
| project identifier: | 2903-8783 | Start: | 2004-06-01 | 82,992 t CO2 e | 836,000 t CO2 e | |||
| title: | Wey Ganga Small Scale Hydropower Project | End: | 2054-05-30 | |||||
| type: | Hydro Energy | |||||||
| Total: | 6,087,489 t CO2 e | 68,156,358 t CO2 e | ||||||