GHG CleanProjects Registry: Project Listing
To filter the list of projects, select an option below:
- All [This is the DEFAULT sort option and will display ALL projects.]
- Prevalidation [Only those projects where the proponent has requested to display the preliminary project information (PIN) or to display the GHG Report will be listed.]
- Validation [Only those projects that have been validated and that have a validation report will be listed.]
- [For this sort option, choose from the drop down list to filter by the PROJECT TYPE ONLY.]
[For this sort option, choose from the drop down to filter the list by the projects COUNTRY LOCATION ONLY.]
- Reduction [This sort option will provide ONLY those projects with the project type classified as a REDUCTION.]
- Removal [This sort option will provide ONLY those projects with the project type classified as a REMOVAL.]
- [This sort option will list the projects based on the vintage or year that you choose for the verified emission reductions or removals (VERRs).]
There are 127 projects listed in the GHG CleanProjects™ Registry. A legend with the numbering system index is at the bottom of this page.
| Listed Projects: | Project Dates: | Estimated potential lifetime emission reductions-removals | |||||
| Project identifier: | 8626-3432 | Start: | 2002-01-01 | 107,041t CO2 e | |||
| Title: | 2007 Tillage Auction Project | End: | 2007-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 9337-2554 | Start: | 2004-01-01 | 24,205t CO2 e | |||
| Title: | Aéroport de Montréal's Energy Efficiency Measures for GHG Emission Reductions Project | End: | 2009-12-31 | ||||
| Type: | Energy Efficiency | ||||||
| Project identifier: | 3064-5172 | Start: | 2002-01-01 | 110,000t CO2 e | |||
| Title: | Aggregation of Carbon Credits from No-Till and Reduced Till Agricultural Practice (Pool 2) | End: | 2007-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 6369-3653 | Start: | 2002-01-01 | 2,000,000t CO2 e | |||
| Title: | Aggregation of Carbon Credits from No-till or Reduced Till Agricultural Practice | End: | 2015-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 7342-8764 | Start: | 2009-01-12 | 160,000t CO2 e | |||
| Title: | AltaGas Bantry Acid Gas Injection Project | End: | 2016-12-31 | ||||
| Type: | Acid Gas Injection | ||||||
| Project identifier: | 8626-2593 | Start: | 2007-01-01 | 22,000t CO2 e | |||
| Title: | AltaGas Princess Acid Gas Injection Project | End: | 2008-02-13 | ||||
| Type: | Acid Gas Injection | ||||||
| Project identifier: | 9524-8578 | Start: | 2002-01-01 | 725,394t CO2 e | |||
| Title: | Avoidance of methane production from decay of biomass through composting | End: | 2010-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 9251-0905 | Start: | 1999-01-01 | 397,652t CO2 e | |||
| Title: | Belize and Nicaragua Logs Recovery Project | End: | 2010-12-31 | ||||
| Type: | Reduced deforestation | ||||||
| Project identifier: | 5708-6545 | Start: | 2007-01-01 | 121,600t CO2 e | |||
| Title: | Blue Ridge Lumber THF Biomass Burner Project | End: | 2015-01-01 | ||||
| Type: | Biomass Energy | ||||||
| Project identifier: | 4125-3966 | Start: | 2009-09-16 | 31,000t CO2 e | |||
| Title: | Blue Trail Wind Farm Offset Project | End: | 2033-09-16 | ||||
| Type: | Wind Energy | ||||||
| Project identifier: | 4952-8046 | Start: | 2009-05-01 | 104,800t CO2 e | |||
| Title: | Brokenlande Biogas Project | End: | 2029-05-01 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 2255-1579 | Start: | 2005-01-01 | 115,344t CO2 e | |||
| Title: | Canfor Grande Prairie Sawmill Biomass Energy Project | End: | 2008-12-31 | ||||
| Type: | Cogeneration | ||||||
| Project identifier: | 7501-3802 | Start: | 2002-01-01 | 53,083t CO2 e | |||
| Title: | Carbon Credit Solutions Inc. Tillage Project #1 | End: | 2008-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 5565-2410 | Start: | 2002-01-01 | 97,251t CO2 e | |||
| Title: | Carbon Credit Solutions Inc. Tillage Project #2 | End: | 2008-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 7590-8550 | Start: | 2002-01-01 | 128,296t CO2 e | |||
| Title: | Carbon Credit Solutions Inc. Tillage Project #3 | End: | 2009-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 2629-5810 | Start: | 2002-01-01 | 106,120t CO2 e | |||
| Title: | Carbon Credit Solutions Inc. Tillage Project #4 | End: | 2009-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 3293-0821 | Start: | 2002-01-01 | 2,000,000t CO2 e | |||
| Title: | Carbon Reduction Offset Project | End: | 2009-12-31 | ||||
| Type: | No-till agriculture | ||||||
| Project identifier: | 8750-4168 | Start: | 2002-01-01 | 73,056t CO2 e | |||
| Title: | Carbon Reduction Offset Project - Series 2 | End: | 2008-12-31 | ||||
| Type: | No-till agriculture | ||||||
| Project identifier: | 5586-8702 | Start: | 2002-01-01 | 125,026t CO2 e | |||
| Title: | Carbon Reduction Offset Project - Series 3 | End: | 2008-12-31 | ||||
| Type: | No-till agriculture | ||||||
| Project identifier: | 5876-5670 | Start: | 2002-01-01 | 185,954t CO2 e | |||
| Title: | Carbon Reduction Offset Project - Series 4 | End: | 2008-12-31 | ||||
| Type: | No-till agriculture | ||||||
| Project identifier: | 6100-7651 | Start: | 2004-01-01 | 640,000t CO2 e | |||
| Title: | Cargill High River Methane Capture Project | End: | 2011-12-31 | ||||
| Type: | Anaerobic Wastewater Treatment | ||||||
| Project identifier: | 5807-0620 | Start: | 2006-04-01 | 47,000t CO2 e | |||
| Title: | Chaudiere Generating Facility | End: | 2007-03-31 | ||||
| Type: | Hydro Energy | ||||||
| Project identifier: | 0766-3464 | Start: | 2007-05-01 | 480,000t CO2 e | |||
| Title: | Chin Chute Wind Power Project | End: | 2015-05-31 | ||||
| Type: | Wind Energy | ||||||
| Project identifier: | 4584-0402 | Start: | 2003-04-01 | 200,000t CO2 e | |||
| Title: | Cleanit Greenit Aerobic Composting Project | End: | 2011-03-31 | ||||
| Type: | Aerobic Composting | ||||||
| Project identifier: | 1717-3741 | Start: | 2005-08-21 | 1,200,000t CO2 e | |||
| Title: | Clover Bar Landfill Gas Generating Station | End: | 2013-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 4593-7854 | Start: | 2007-05-01 | 1,200,000t CO2 e | |||
| Title: | CO2 Capture from Prentiss1 for EOR | End: | 2014-12-31 | ||||
| Type: | CO2 Injection | ||||||
| Project identifier: | 3482-7976 | Start: | 2006-01-01 | 640,000t CO2 e | |||
| Title: | CO2 Capture from Prentiss2 for EOR | End: | 2013-12-31 | ||||
| Type: | CO2 Injection | ||||||
| Project identifier: | 4765-7933 | Start: | 2003-01-01 | 12,273t CO2 e | |||
| Title: | Commission Scolaire Marguerite-Bourgeoys' (CSMB) energy efficiency measures for GHG Emission Reductions Project | End: | 2008-12-31 | ||||
| Type: | Energy Efficiency | ||||||
| Project identifier: | 9251-6893 | Start: | 2005-01-09 | 2,230,000t CO2 e | |||
| Title: | Community Ecosystem Restoration Project | End: | 2010-05-30 | ||||
| Type: | Reforestation | ||||||
| Project identifier: | 0290-6314 | Start: | 2003-01-01 | 28,490t CO2 e | |||
| Title: | Construction GFL, concrete Recycling Project | End: | 2008-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 8047-8047 | Start: | 2002-01-01 | 4,200,000t CO2 e | |||
| Title: | East Landfill - Landfill Gas Recovery and Utilization Project | End: | 2016-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 8444-7468 | Start: | 2002-01-01 | 65,548t CO2 e | |||
| Title: | ECC Tillage Management Project #5 | End: | 2008-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 8702-6958 | Start: | 2002-01-01 | 75,000t CO2 e | |||
| Title: | ECC Tillage Management Project #6 | End: | 2009-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 8047-4011 | Start: | 2007-01-01 | 223,604t CO2 e | |||
| Title: | Edmonton Composting Facility | End: | 2008-12-31 | ||||
| Type: | Aerobic Composting | ||||||
| Project identifier: | 8828-9938 | Start: | 2002-01-01 | 417,618t CO2 e | |||
| Title: | Emission Credits Corporation Tillage Program | End: | 2006-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 3364-6900 | Start: | 1994-01-01 | 41,000t CO2 e | |||
| Title: | Emission reductions of the truck fleet at SGT 2000 Inc. | End: | 2015-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 5084-7388 | Start: | 2006-01-01 | 33,111t CO2 e | |||
| Title: | Enviroval Inc.'s GHG emission reductions | End: | 2008-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 2474-6209 | Start: | 2009-01-01 | 600,000t CO2 e | |||
| Title: | Essex-Windsor Regional Landfill Gas Capture and Destruction Project | End: | 2019-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 8180-7777 | Start: | 2009-05-14 | 169,646t CO2 e | |||
| Title: | Extraction et combustion des biogaz - CESA | End: | 2013-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 9370-7483 | Start: | 2009-05-27 | 185,969t CO2 e | |||
| Title: | Extraction et combustion des biogaz - RDL | End: | 2013-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 0883-0920 | Start: | 2009-06-08 | 158,256t CO2 e | |||
| Title: | Extraction et combustion des biogaz - RIRT | End: | 2013-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 7910-0498 | Start: | 2002-01-01 | 119,478t CO2 e | |||
| Title: | Ferti-Val and Agrior Greenhouse Gas Emission Reductions Composting Project | End: | 2007-03-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 5015-7090 | Start: | 2005-09-01 | 56,000t CO2 e | |||
| Title: | Gas Usage Reduction Initiative Project | End: | 2009-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 1451-4954 | Start: | 2007-01-01 | 600,000t CO2 e | |||
| Title: | Green Roof Technology | End: | 2037-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 2992-8321 | Start: | 2006-01-01 | 720,000t CO2 e | |||
| Title: | Greenhouse Gas Reductions for Wheeled Vehicles (Pneumatic Tires) | End: | 2012-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 3048-9943 | Start: | 2006-06-01 | 150,000t CO2 e | |||
| Title: | Heffley Creek Biomass Gasification Project | End: | 2026-06-01 | ||||
| Type: | Biomass Energy | ||||||
| Project identifier: | 3574-1666 | Start: | 1999-01-01 | 138,682t CO2 e | |||
| Title: | IMAFLEX GHG emission reductions/Plastic Recycling Project | End: | 2006-12-31 | ||||
| Type: | Plastic Recycling | ||||||
| Project identifier: | 3168-5278 | Start: | 2009-08-19 | 40,329t CO2 e | |||
| Title: | Implantation d'un réseau de captage et de destruction du biogaz au lieu d'enfouissement sanitaire de La Lièvre | End: | 2013-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 9851-6244 | Start: | 2009-08-12 | 37,656t CO2 e | |||
| Title: | Implantation d'un réseau de captage et de destruction du biogaz au lieu d'enfouissement sanitaire de Saint-Raymond | End: | 2013-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 7393-3044 | Start: | 2009-08-27 | 48,975t CO2 e | |||
| Title: | Implantation d'un réseau de captage et de destruction du biogaz au lieu d'enfouissement sanitaire de Ville de Rivière Rouge | End: | 2013-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 7514-3762 | Start: | 2009-07-15 | 73,556t CO2 e | |||
| Title: | Implantation d'un réseau de captage et de destruction du biogaz au lieu d'enfouissement sanitaire Saint-Lambert-de-Lauzon | End: | 2013-12-31 | ||||
| Type: | Landfill Gas Capture | ||||||
| Project identifier: | 1840-6051 | Start: | 2006-10-01 | 15,949,205t CO2 e | |||
| Title: | Intermodal Transportation Project | End: | 2016-09-30 | ||||
| Type: | Intermodal transportation | ||||||
| Project identifier: | 6821-1178 | Start: | 2007-01-01 | 601,803t CO2 e | |||
| Title: | Kettles Hill Offset Project | End: | 2014-12-31 | ||||
| Type: | Wind Energy | ||||||
| Project identifier: | 2181-2911 | Start: | 2002-01-01 | 554,268t CO2 e | |||
| Title: | Les produits Polychem Canada Inc. Plastic Recycling GHG Emission Reductions Project | End: | 2010-12-31 | ||||
| Type: | Plastic Recycling | ||||||
| Project identifier: | 6866-4768 | Start: | 2004-10-01 | 136,800t CO2 e | |||
| Title: | Macleod Flats Wind Turbine Offset Project | End: | 2028-10-01 | ||||
| Type: | Wind Energy | ||||||
| Project identifier: | 0043-9907 | Start: | 2004-10-01 | 1,800,000t CO2 e | |||
| Title: | Magrath Wind Power Project | End: | 2034-10-01 | ||||
| Type: | Wind Energy | ||||||
| Project identifier: | 6703-4605 | Start: | 2003-02-09 | 219,702t CO2 e | |||
| Title: | McBride Lake Offset Project Phase 1 | End: | 2007-12-31 | ||||
| Type: | Wind Energy | ||||||
| Project identifier: | 3274-8695 | Start: | 2002-01-01 | 62,524t CO2 e | |||
| Title: | McGill University Health Centre's Energy Efficiency Measures for GHG Emission Reductions Projects | End: | 2011-12-31 | ||||
| Type: | Energy Efficiency | ||||||
| Project identifier: | 2690-5813 | Start: | 2003-01-01 | 103,320t CO2 e | |||
| Title: | Minas Basin GHG emission reductions | End: | 2010-12-31 | ||||
| Type: | Energy Efficiency | ||||||
| Project identifier: | 6893-4564 | Start: | 2006-01-01 | 5,250,000t CO2 e | |||
| Title: | Mobile Greenhouse Gas Reduction - Engine and Fuel Treatment | End: | 2012-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 9198-0478 | Start: | 2006-01-01 | 5,250,000t CO2 e | |||
| Title: | Mobile Greenhouse Gas Reduction - Engine Treatment | End: | 2012-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 2860-6503 | Start: | 2006-01-01 | 250,000t CO2 e | |||
| Title: | Mobile Greenhouse Gas Reductions | End: | 2012-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 4918-2962 | Start: | 2009-09-01 | 11,917,104t CO2 e | |||
| Title: | Municipal Solid Waste to Power Technology | End: | 2049-09-01 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 3547-4902 | Start: | 2004-08-01 | 1,206,271t CO2 e | |||
| Title: | Nakkawita, Pantak, and Gurulawana Small Scale Hydropower Projects | End: | 2054-07-31 | ||||
| Type: | Hydro Energy | ||||||
| Project identifier: | 7732-0939 | Start: | 2005-01-07 | 5,500,000t CO2 e | |||
| Title: | Natural Gas Combined Cycled Power Generation Plant | End: | 2030-12-31 | ||||
| Type: | Electricity Generation | ||||||
| Project identifier: | 2101-0072 | Start: | 2002-01-01 | 175,744t CO2 e | |||
| Title: | Natural Gas Reduction Project | End: | 2007-10-01 | ||||
| Type: | Electricity Generation, Energy Efficiency | ||||||
| Project identifier: | 5938-7350 | Start: | 2003-06-01 | 640,000t CO2 e | |||
| Title: | Oldman River Hydroelectric Power Plant | End: | 2011-05-31 | ||||
| Type: | Electricity Generation | ||||||
| Project identifier: | 9238-1983 | Start: | 2008-05-15 | 3,200,000t CO2 e | |||
| Title: | Orica Nitric Acid Plant 1 - Nitrous Oxide Abatement from Nitric Acid Production | End: | 2014-12-31 | ||||
| Type: | Nitrous Oxide Abatement from Nitric Acid Production | ||||||
| Project identifier: | 5859-2714 | Start: | 2001-01-01 | 429,848t CO2 e | |||
| Title: | PerfectPleat Extended Surface Pleated Filter Project | End: | 2039-05-30 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 2473-3680 | Start: | 2002-01-01 | 1,200,000t CO2 e | |||
| Title: | Perlite Insulation for an Industrial Medium Heat Environment | End: | 2012-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 6717-8308 | Start: | 2003-01-01 | 522,442t CO2 e | |||
| Title: | Post-Industrial Plastic Recycling | End: | 2015-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 6375-2711 | Start: | 2002-01-01 | 49,042t CO2 e | |||
| Title: | Preferred Carbon Land Management Solutions Pilot Tillage Project | End: | 2009-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 9091-1884 | Start: | 2006-04-01 | 20,307t CO2 e | |||
| Title: | Projet d'implantation de mesures d'efficacité énergétique pour la réduction des gaz à effet de serre (GES) de l'Office municipal d'habitation de Montréal (OMHM) | End: | 2010-12-31 | ||||
| Type: | Energy Efficiency | ||||||
| Project identifier: | 3876-3354 | Start: | 2003-10-23 | 678,605t CO2 e | |||
| Title: | Quantification of CO2 eq emission reductions from slag-based recycling operations by Matériaux Excell | End: | 2007-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 8316-1152 | Start: | 2002-11-01 | 22,614t CO2 e | |||
| Title: | Quantification of net CO2e emission reductions for the manufacturing of pallets made from 100% recycled plastic by Solplast Inc. (2002-2006) | End: | 2006-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 9181-5474 | Start: | 2002-11-01 | 54,294t CO2 e | |||
| Title: | Quantification of net CO2e emission reductions from plastic and rubber recycling operations by Solplast Inc. | End: | 2008-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 6060-2548 | Start: | 2002-01-01 | 474,296t CO2 e | |||
| Title: | Quantification of net CO2e emission reductions from polyethylene terephtalate and polypropylene recycling operations by Plastrec Inc. (2002-2006) | End: | 2011-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 0384-1153 | Start: | 2001-01-01 | 98,326t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for compost | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 8810-1861 | Start: | 2000-01-01 | 32,369t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for compost | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 3442-0876 | Start: | 1999-01-01 | 91,830t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for cow bedding | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 3470-5272 | Start: | 2005-01-01 | 19,415t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for cow bedding | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 8291-2312 | Start: | 2000-01-01 | 90,802t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for cow bedding | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 9790-6601 | Start: | 2002-01-01 | 62,470t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for cow bedding | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 2986-5204 | Start: | 1999-01-01 | 51,090t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for cow bedding and compost | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 4491-4407 | Start: | 2001-01-01 | 41,592t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for cow bedding and fertilizer | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 5338-3502 | Start: | 2003-01-01 | 31,031t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for cow bedding and fertilizer | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 8532-2612 | Start: | 1999-01-01 | 45,216t CO2 e | |||
| Title: | Recovery of Manure/Recovered manure for cow bedding and fertilizer | End: | 2006-12-31 | ||||
| Type: | Methane Venting Reduction | ||||||
| Project identifier: | 9818-8372 | Start: | 2003-01-01 | 70,646t CO2 e | |||
| Title: | Recyc RPM GHG Emission Reductions Recycling Project | End: | 2006-12-31 | ||||
| Type: | Recycling | ||||||
| Project identifier: | 1985-5627 | Start: | 2004-01-01 | 73,708t CO2 e | |||
| Title: | Recyclage Granutech Inc.- Rubber Recovery Process Project | End: | 2007-12-31 | ||||
| Type: | Industrial recycling project | ||||||
| Project identifier: | 1538-2445 | Start: | 2003-01-01 | 131,364t CO2 e | |||
| Title: | Recycled/Transformed foodstuffs intended for the animals process by Prorec inc. | End: | 2007-12-15 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 4909-7303 | Start: | 2005-01-01 | 50,696t CO2 e | |||
| Title: | Recycor Greenhouse Gas Emissions Reduction Recycling Project | End: | 2012-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 1577-8473 | Start: | 2002-01-01 | 2,000,000t CO2 e | |||
| Title: | Reduced and Zero Tillage Management | End: | 2015-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 0275-9577 | Start: | 2002-01-01 | 2,000,000t CO2 e | |||
| Title: | Reduced and Zero Tillage Management - Pool 2 | End: | 2015-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 7850-9764 | Start: | 2002-01-01 | 2,000,000t CO2 e | |||
| Title: | Reduced and Zero Tillage Management - Pool 3 | End: | 2015-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 6796-8882 | Start: | 2005-09-01 | 56,000t CO2 e | |||
| Title: | Refiner Plate Energy Savings Project | End: | 2009-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 4825-6129 | Start: | 2000-01-01 | 162,500t CO2 e | |||
| Title: | Royal Mat Inc. - Recycling of tires/Manufacturing of mats with recycled tires | End: | 2010-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 0456-8986 | Start: | 2003-01-01 | 469,242t CO2 e | |||
| Title: | Rubber Recycling Project | End: | 2012-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 8524-7427 | Start: | 2005-01-01 | 360,000t CO2 e | |||
| Title: | Slave Lake Pulp Energy Efficiency Project | End: | 2013-12-31 | ||||
| Type: | Energy Efficiency | ||||||
| Project identifier: | 7635-3949 | Start: | 2006-09-01 | 3,200,000t CO2 e | |||
| Title: | Soderglen Windfarm Project | End: | 2026-01-28 | ||||
| Type: | Wind Energy | ||||||
| Project identifier: | 7758-5940 | Start: | 2002-01-01 | 2,320,000t CO2 e | |||
| Title: | Summerview and Waterton South Wind Farms Offset Project | End: | 2031-01-01 | ||||
| Type: | Wind Energy | ||||||
| Project identifier: | 2959-5549 | Start: | 2007-03-05 | 80,000t CO2 e | |||
| Title: | Suncor South Rosevear Acid Gas Injection Offset Project | End: | 2015-03-04 | ||||
| Type: | Acid Gas Injection | ||||||
| Project identifier: | 7048-9023 | Start: | 2005-10-01 | 20,000t CO2 e | |||
| Title: | Sundance Biomass Energy Generation Projects | End: | 2013-10-01 | ||||
| Type: | Biomass Energy | ||||||
| Project identifier: | 3157-5491 | Start: | 2008-01-01 | 117,600t CO2 e | |||
| Title: | Sundre Forest Product TFH Biomass Burner Project | End: | 2016-01-01 | ||||
| Type: | Biomass Energy | ||||||
| Project identifier: | 3185-9581 | Start: | 2005-01-01 | 400,000t CO2 e | |||
| Title: | Sym-Tech Tire-GardTM with Nitrogen Tire Inflation | End: | 2012-07-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 0944-6186 | Start: | 2003-01-01 | 49,760t CO2 e | |||
| Title: | T.M.R. Landfill Greenhouse Gas Emission Avoidance | End: | 2010-12-31 | ||||
| Type: | Waste Diversion | ||||||
| Project identifier: | 6878-6600 | Start: | 2004-11-30 | 800,000t CO2 e | |||
| Title: | Taylor Turin Acid Gas Injection Project | End: | 2012-11-30 | ||||
| Type: | Acid Gas Injection | ||||||
| Project identifier: | 4168-9826 | Start: | 2002-01-01 | 220,248t CO2 e | |||
| Title: | Terra Verde Aggregation Contract I and II | End: | 2008-10-02 | ||||
| Type: | No-till agriculture | ||||||
| Project identifier: | 1526-7379 | Start: | 2002-01-01 | 29,671t CO2 e | |||
| Title: | Terra Verde Aggregation Contract II and III | End: | 2009-03-05 | ||||
| Type: | No-till agriculture | ||||||
| Project identifier: | 3641-1106 | Start: | 2002-01-01 | 111,598t CO2 e | |||
| Title: | Terra Verde Aggregation Contract IV | End: | 2009-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 7496-3705 | Start: | 2002-01-01 | 106,613t CO2 e | |||
| Title: | Terra Verde Aggregation Contract V | End: | 2009-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 9737-8689 | Start: | 2007-07-02 | 2,280,165t CO2 e | |||
| Title: | The Blackstone Collingwood Ethanol Facility Project | End: | 2028-07-02 | ||||
| Type: | Fuel Switching | ||||||
| Project identifier: | 0561-8286 | Start: | 2005-04-01 | 1,701,000t CO2 e | |||
| Title: | The Egyptian Brick Factory Fuel-Switch Project | End: | 2026-04-01 | ||||
| Type: | Fuel Switching | ||||||
| Project identifier: | 0149-2374 | Start: | 2002-01-01 | 5,000,000t CO2 e | |||
| Title: | Thermo-12 Gold Insulation for an Industrial High Heat Environment | End: | 2012-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 8667-3101 | Start: | 2002-01-01 | 600,000t CO2 e | |||
| Title: | Thermo-12 Gold Insulation vs. Perlite for an Industrial Environment | End: | 2012-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Project identifier: | 6516-7168 | Start: | 2002-01-01 | 80,630t CO2 e | |||
| Title: | Tillage 08 #3 | End: | 2008-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 9563-5577 | Start: | 2002-01-01 | 500,000t CO2 e | |||
| Title: | Tillage 09 #1 | End: | 2008-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 8614-1303 | Start: | 2002-01-01 | 4,000,000t CO2 e | |||
| Title: | Tillage Management Offset Project | End: | 2015-01-01 | ||||
| Type: | Sequestration | ||||||
| Project identifier: | 4278-6661 | Start: | 2002-01-01 | 146,963t CO2 e | |||
| Title: | Tillage Management Offset Project - Series 2 | End: | 2009-12-31 | ||||
| Type: | No-till agriculture, Zero-Till Cropping | ||||||
| Project identifier: | 4810-8381 | Start: | 2002-01-01 | 43,556t CO2 e | |||
| Title: | Tillage Management Offset Project - Series 3 | End: | 2009-12-31 | ||||
| Type: | No-till agriculture | ||||||
| Project identifier: | 2710-4907 | Start: | 2002-01-01 | 96,357t CO2 e | |||
| Title: | Tillage Management Offset Project - Series 4 | End: | 2008-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 1989-0317 | Start: | 2002-01-01 | 251,106t CO2 e | |||
| Title: | Tillage Management Offset Project - Series 5 | End: | 2009-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 1991-1940 | Start: | 2002-01-01 | 270,000t CO2 e | |||
| Title: | TransAlta McBride Lake Wind Farms Offset Project | End: | 2031-01-01 | ||||
| Type: | Wind Energy | ||||||
| Project identifier: | 3877-1697 | Start: | 2006-01-01 | 2,500,000t CO2 e | |||
| Title: | Verdant Energy Limited - Dapp Power Electric Generation Facility | End: | 2031-12-31 | ||||
| Type: | Biomass Energy | ||||||
| Project identifier: | 8209-2096 | Start: | 2002-01-01 | 205,310t CO2 e | |||
| Title: | Viterra's Tillage Management Offset Project - Series 6 | End: | 2009-12-31 | ||||
| Type: | No-till agriculture, Reduced-till agriculture | ||||||
| Project identifier: | 4539-8391 | Start: | 2008-08-01 | 120,000t CO2 e | |||
| Title: | Western Biodiesel Inc. Biodiesel Project | End: | 2016-08-01 | ||||
| Type: | Biofuels Production and Usage | ||||||
| Project identifier: | 2903-8783 | Start: | 2004-06-01 | 836,000t CO2 e | |||
| Title: | Wey Ganga Small Scale Hydropower Project | End: | 2054-05-30 | ||||
| Type: | Hydro Energy | ||||||
| Project identifier: | 6869-0631 | Start: | 2007-01-01 | 600,000t CO2 e | |||
| Title: | White Roof Technology | End: | 2037-12-31 | ||||
| Type: | Energy Conservation | ||||||
| Potential aggregated total of emission reductions-removals listing: 112,413,076 t CO2 e | |||||||